Scope: Construction of two schools in two different locations under one contract (Irbid City &
Mafraq City), with a total build up area of 8,000 m², as follows:
- Al-Bayada Secondary School: Consists of one main building with four floors and a total build up
area of 4,000 m², on a plot of land with an area of 7,600 m².
- Al-Hamra Primary School: Consists of one main building with four floors and a total build up
area of 4,000 m², on a plot of land with an area of 6,000 m².
Both schools include external facades made of natural Riwihed stone, interior finishes, as well as
mechanical and electrical works.
The project also includes external works such as external yards from cement tiles and stamped concrete,
sports fields, green areas with an area of 2,200 m², retaining walls, and gates.
وصف المشروع
إنشاء مدرستين في منطقتين مختلفتين ضمن عقد واحد (مدينة إربد و مدينة المفرق) و بمساحة إجمالية للمباني
8000 م²، كما يلي:
- مدرسة البياضة الثانوية: مدرسة متكاملة مكونة من مبنى رئيسي أربعة طوابق و بمساحة إجمالية 4000 م² و
على قطعة أرض مساحتها الإجمالية 7,600 م².
- مدرسة الحمراء الأساسية: مدرسة متكاملة مكونة من مبنى رئيسي أربعة طوابق و بمساحة إجمالية 4,000 م²
و على قطعة أرض مساحتها الإجمالية 6000 م².
تشمل المدرستين أعمال الواجهات المعمارية من حجر روضة الطبيعي، أعمال التشطيبات الداخلية المتميزة، الأعمال
الميكانيكية والكهربائية.
بالإضافة إلى الأعمال الخارجية التي تشمل أعمال الساحات الخارجية المبلطة من بلاط إسمنتي و Stamped
Concrete، الملاعب الرياضية، المناطق الخضراء بمساحة 2200 م²، الجدران الاستنادية، والبوابات.